One-Stop Mining
Farm Solutions
Mining hardware, cooling systems, power infrastructure and project delivery—all coordinated to support your mining farm.
How a Mining Farm Works
An overview of the main systems and equipment involved in a mining operation.
Available energy
Grid · Gas · Renewables
Power infrastructure
Transformers · protection · PDU
Air, hydro or immersion cooling
Selected to match miner models, power load and site conditions.
Heat rejection or reuse
Outdoor cooling · Optional heat recovery
What does your project need?
Tell us about your power supply, site, existing miners, available space and budget. If you already have equipment or infrastructure, we'll help check what can be reused, upgraded or added.
A setup that fits your project.
We'll help you choose the right miners, power equipment and cooling systems based on your project size and site conditions, then plan what needs to be supplied and installed.
See how a complete mining site comes together.
Take a closer look at a real 50 MW mining deployment in Ethiopia, from power infrastructure to hydro-cooling containers. See how the equipment works together in a fully built mining site.
From Project Planning to Site Startup.
We assess your site, configure the equipment, and coordinate delivery and installation based on your project requirements.
01 / ASSESS
Understand Your Site
Review your location, available power, site conditions, existing miners and target capacity.
SITE & POWER ASSESSMENT
02 /DESIGN
Configure Your Setup
Match miner quantity, power distribution, cooling systems and site layout to your project.
PRELIMINARY CONFIGURATION
03 / PREPARE
Confirm Equipment & Scope
Confirm equipment models, quantities, specifications, pricing and the agreed delivery and installation scope.
QUOTATION & PROJECT SCOPE
04 / DELIVER
Deliver & Install Equipment
Coordinate equipment shipping, site preparation and installation according to the agreed plan.
DELIVERY & INSTALLATION
05 / START
Commission & Support
Check system operation, support startup, complete handover and provide agreed technical support.
STARTUP & HANDOVER
The equipment, installation and support scope is confirmed based on each project's requirements.
What Goes Into the Budget?
Project costs depend on equipment selection, site conditions and delivery scope. We help identify the main costs before the project begins.
UPFRONT Mining hardware · Power equipment · Cooling systems · Site preparation · Shipping · Installation
ONGOING Electricity · Internet connectivity · Maintenance · Spare parts
Power Solutions for Your Mining Site.
From grid connections to gas generation and renewable energy, we help plan the power supply and distribution systems around your site's capacity and operating requirements.
What we need to know: Share your location, available energy sources and expected mining capacity. We can help identify suitable power equipment and configurations for your site.
What should I check for each power source?
Available capacity, voltage, electricity price and connection requirements.
Fuel supply and quality, emissions requirements and generator servicing.
Changes in output, grid options and whether storage or controls are useful for the site.
Match Your Miners with the Right Cooling.
Cooling requirements depend on miner models, site conditions and operating goals. We help match mining hardware with suitable cooling systems for your project.
Start with Your Miners. Plan the Site Around Them.
Already have miners or planning to buy? We'll help you choose compatible hardware, cooling and site equipment based on your project.
Share your miner models and quantities. We'll check power requirements and suitable cooling options.
Tell us your power capacity, budget and site conditions. We'll help plan the miners, cooling and infrastructure.
Air Cooling
Air-cooled miners use built-in fans to move heat into the surrounding air. Proper ventilation helps maintain operating temperatures and remove hot air from the mining area.
A straightforward cooling setup with widely available equipment and relatively simple maintenance.
Hydro Cooling
Coolant circulates through compatible hydro miners, carrying heat to external cooling equipment such as dry coolers.
Suitable for high-density mining operations requiring controlled heat removal and integrated cooling systems.
Immersion Cooling
Miners operate submerged in dielectric fluid. Heat transfers from the equipment into the fluid and is carried to a heat exchanger.
Suitable for high-density deployments, with reduced exposure to airborne dust and less reliance on miner cooling fans.
How does cooling affect site energy use?
PUE compares a facility’s total energy use with the energy used by its mining equipment. A figure closer to 1.0 means less energy is used by cooling and other supporting systems.
Don't Have Miners Yet? Planning to Buy?
Explore our range of ASIC miners and find the right equipment for your mining project.
Mining Site Deployment Options
Whether you are building a new site or using an existing building, we can plan the mining equipment around the space you have.
Outdoor Mining Containers
Deploy miners in purpose-built containers with integrated cooling and power distribution systems.
- 20 ft and 40 ft container configurations
- Air-cooled, hydro-cooled, and immersion-cooled options
- Integrated power distribution and PDU systems
- Scalable capacity for future expansion
Indoor Mining Facilities
Turn warehouses or existing buildings into mining facilities with organized equipment layouts and supporting infrastructure.
- Mining racks and electrical distribution
- Ventilation and airflow management
- Hot and cold aisle separation
- Water curtains where site conditions require them
Already have a mining farm?
We can discuss additional miners, cooling or containers for your next stage of growth.
Mining creates heat.
Put it to use.
Mining equipment generates heat during operation. With a suitable heat recovery system, that heat can be transferred to residential heating, hot water and other applications.
Use recovered mining heat for underfloor heating, radiators or domestic hot water, depending on the system configuration and heating requirements.
Recovered heat can also support greenhouses, swimming pools, workshops and other facilities with suitable heating demand.
The right setup depends on the equipment, site and temperature required.
Plan for Reliable Mining Operations.
Beyond equipment, mining sites require comprehensive planning for electrical, cooling, monitoring, and maintenance.
01 Electrical safety
Use cables and protection rated for the site; include regular thermal checks for hot connections.
02 Cooling and water quality
Follow miner specifications for inner-loop coolant; plan outer-loop water treatment and freeze protection where needed.
03 Network and monitoring
Consider a backup connection and separate miner and management networks. Vendor tools, Foreman or Awesome Miner can help monitor equipment.
04 Spare parts
Plan for PSUs, fans where used and control boards. The original guide suggests starting examples of 2%, 5% and 1% respectively; adjust to your equipment and repair plan.
05 Site conditions
Monitor temperature, dust and dew point; clean filters and water curtains according to equipment guidance.
06 Technical support
Discuss documentation, commissioning, spare parts and available remote or on-site support for your project.
What could your power support?
Estimate miner slots from small micro-slot setups up to full hydro containers, and explore matching cooling equipment across all slot tiers.
Estimate miner slots from your power.
1 MW available − 10% set aside = 900 kW for miners.
900 kW ÷ 5.37 kW per miner → 167 miner slots (rounded down).
1,000 kW − 167 × 5.37 kW → 103.21 kW left for cooling and other site loads.
Matching hydro cooling equipment for 167 miner slots
167 slots for Antminer S21+ Hydro 358T (5.37 kW each) → 1 × 180-slot container (180 slots). Listed below are the closest catalogue matches from our hydro cooling range; confirm cooling capacity, miner compatibility and combined site power before ordering.
A preliminary illustration based on miner slot count from small slots to full containers, not a final design. The allowance is adjustable and may not cover actual site loads. Confirm miner compatibility, partial-load operation, cooling capacity, local climate and the combined power of miners, pumps, fans and other equipment.
Enter site power from 1 kW to 10,000 MW, a site allowance from 0% to 99%, and miner power from 0.01 to 1,000 kW.
Frequently Asked Questions
Start with your project location, available power, planned mining capacity and budget. If some details are not yet confirmed, our team can help assess your requirements and identify suitable configurations.
Yes. We can plan mining infrastructure around your existing land, warehouse or industrial building. The equipment layout, cooling system and power distribution can be configured according to your site's conditions.
Containerized mining farms use modular units to house miners and supporting systems, making them suitable for outdoor deployments. Indoor mining farms use existing buildings or warehouses, with mining racks, ventilation and electrical systems configured to fit the space.
Power requirements depend on the number of miners, their individual power consumption and supporting equipment such as cooling systems and pumps. Share your available power with us, and we can estimate your mining capacity and recommend suitable configurations.
The right cooling method depends on your miner models, operating environment, site conditions and budget. We can help compare air, hydro and immersion cooling options based on your project requirements.
Yes. We supply ASIC miners and supporting infrastructure, including transformers, power distribution equipment, cooling systems and mining containers. Equipment can be coordinated according to your project configuration and supply requirements.
The timeline depends on project size, equipment availability, site preparation and installation requirements. We will establish a delivery schedule based on the confirmed project scope and equipment configuration.
Yes. Installation coordination and commissioning support can be arranged according to the project scope. The specific services and on-site responsibilities will be confirmed before project execution.
Yes. Mining capacity can be expanded in stages, provided sufficient power, cooling capacity and site space are available. We can consider future expansion requirements when planning the initial infrastructure.
We provide technical assistance for equipment operation, troubleshooting and maintenance inquiries. Depending on the project and service agreement, support may include remote assistance, spare parts coordination and on-site technical support.
Tell us about
your mining project.
Whether you already have a detailed plan or are just getting started, we can discuss the next step with you.
Let’s plan your farm.
Share your site, equipment and cooling needs through our online project form.
- Project location and stage
- Available or expected power
- Miners, cooling and site requirements
Or email us at info@apexto.com.cn.
Air-Cooled Miners
Hydro-Cooled Miners
Immersion-Cooled Miners
Solo Miners
Home Miners & Heaters
Used ASIC Miners
Bitmain Antminer
Whatsminer
Goldshell
Canaan Avalon
IceRiver
Elphapex
Bitcoin
Dogecoin
Litecoin
Kaspa
Alephium
Ethereum Classic




